



KHEMISSET PROJECT INFO
The station will ensure the supply of drinking water to the towns of Khemisset, Tifelt and neighboring centers from the El Kansera dam. The social and economic impacts of this achievement are undeniable. Creation of a treated water tank of 2*1000 m3 Creation of the civil engineering of the SP1 treated water pumping station with characteristics Qtotal= 275l/s; Quantity=95l/s – HMT= 155m; Cabin for transformer station including its equipment; Electrical installation; Surroundings developments; Redevelopment of the existing operating building.
Date
January 08, 2018
Client
Branding NthPsd Company
Project type
Contruction, Brading
Creative Director
Lorem Ipsum doler