CASABLANCA PROJECT INFO
The project aims to ensure the strengthening of sanitation infrastructure in the town of Bir Jdid. Measuring 3.2mx2.2m and with a length of 1100m, the collector was made in a gallery using the trenchless technique. The access shafts reach 27m depth.
Date
January 08, 2018
Client
Branding NthPsd Company
Project type
Contruction, Brading
Creative Director
Lorem Ipsum doler